Etobicoke Long Term Care Facility

This project had to meet the intensive healthcare standards for generator sets and offer long-term flexibility for the growth of their facilities, all while adhering to a specific project budget.

VIEW CASE STUDY DOWNLOAD PDF

Dorssers Inc.

Dorssers Inc., a Canadian manufacturer of pellet mill dies, rolls and roll parts, needed to improve their power quality and reliability while still generating on-site power at an economically sensible price.

VIEW CASE STUDY DOWNLOAD PDF

Sarnia City Hall

T&T Power Group was selected as an alternate manufacturer through the tender process to supply a standby power system for the Sarnia City Hall. The power solution would support their critical systems in City headquarters.

VIEW CASE STUDY DOWNLOAD PDF

Saskatoon Civic Operations Centre

Along with the General Contractor, T&T Power Group investigated a number of configurations including a single 1 MWe solution ultimately deciding on a parallel solution that incorporated 2 x 500 kWe machines.

VIEW CASE STUDY DOWNLOAD PDF

 

 

Have Questions, or Need a Power Solution For Your Facility?

CONTACT US